欧美在一区I久久综合九色I久久avavI毛片随便看I久久婷婷开心I91在线看免费I久久久影片I国产精品久久久一区二区I97色国产I毛片永久新网址首页I精品专区一区二区

Current Location:Home > Product > IF induction series > IF power supply

2018-10-26 10:13:27

Share
  • Share to WeChat Moments

RAZ-400KW intermediate frequency power supply---+---furnace shelf (combination)

  • Description

Induction Heating Power Supply--Safety Operation Guide


1. Before starting the machine, first check whether the water, gas and electricity are connected. After connecting, the following operations can be performed;

2. The operator must prepare corresponding insulating shoes, gloves, etc.

3. The operator must have the corresponding electrical knowledge.

4. Before the equipment is overhauled, the electric switch must be pulled off to confirm that the power supply is disconnected, and then the discharge treatment is carried out, and then the overhaul card is hung up, and the overhaul is repeated.

5. Before starting the machine, first make sure that the waterway is normal and all parts of the equipment are normal before starting the machine.

6. Turn on the first gear filament first, then turn on the second gear filament after five minutes, and then send the high voltage after another five minutes.

7. Before sending high voltage, make sure that the output adjustment potentiometer is in a small position, and then send high voltage, and adjust the output voltage to the working voltage.

8. After confirming that there is a workpiece, you can press the heating button to make the equipment work, but no-load heating is not allowed.

9. If there is an abnormality in the equipment during work, the power supply must be disconnected immediately, and the reason should be checked before working again.

10. After the equipment is finished working, first disconnect the heating, then disconnect the high voltage, then turn off the filament and disconnect the power supply.

11. After the equipment stops working, wait for five minutes before disconnecting the water source.

12. During the operation of the equipment, if there is a temporary need to leave, it must be done. People leave the machine and stop it. It is not allowed. The machine is still working when there is no one.


weekly maintenance

1. When taking over the shift, check the flow of the cooling water outlet pipe of the equipment for abnormal phenomena. For equipment that uses evaporative cooling tubes, it is necessary to check whether the water level of the distilled water tank is qualified;

2. When taking over, check whether the cooling air volume of the glass shell and core column of the electronic tube and other ventilation and heat dissipation facilities are normal;

3. Check whether the contacts of each AC contactor are ablated and whether the wiring is loose;

4. Measure the insulation resistance of cooling water. The ground resistance of the anode of the water-cooled tube should be greater than 300K ohms;

5. The cooling water pipes of the electronic tube grid and the filament are mostly rubber tubes, which are easy to age and should be carefully checked. For the rubber tube that is aging and about to break, it should be updated in time;

6. Do a cleaning and dust removal on the inside of the chassis, wipe off the dust of each high-pressure porcelain bottle and insulating pillars, and pay attention to the cleaning of the dust filter on the air inlet of the fan. Prevent the air intake from being blocked and reduce the air output.


Semi-annual maintenance

1. Check whether the insulation performance of the low-voltage electric control circuit is qualified;

2. Use a megohmmeter to detect the insulation resistance of high-voltage devices such as high-voltage rectifier transformers, high-voltage cables, and high-voltage silicon stacks, and the value should meet the requirements;

3. Check the roundness of the inner tube of the water jacket of the electronic tube and the height of the positioning protrusion, so as to prevent the partial overheating of the anode caused by the deviation of the tube. And check whether there is scaling at the water jacket outlet and inlet pipe joints, and whether the anti-corrosion electrode is normal; 4. Check the set current value of each overcurrent relay;

5. For connecting conductors with high temperature during operation, such as filament lead wires, soft connecting wires for welding transformer primary coils, etc., if there is poor oxidation contact, additional treatment should be made;

7. Thoroughly clean the hidden places such as the top of the cabinet and the cable trench.


Link to this article:http://www.hlgbaby.com/en/product/product20181026142.html
Previous:NO!
Next:NO!

Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 2021在线精品自偷自拍无码 | 在线精品亚洲一区二区动态图 | 国产精品线路一线路二| 亚洲午夜未满十八勿入| 少妇高潮太爽了在线观看| 欧美性大战久久久久久久| 丝袜美腿丝袜亚洲综合| 韩国的无码av看免费大片在线| 国产亚洲精品精品国产亚洲综合| 国语对白做受xxxxx在线| 色狠狠久久av五月综合| 国产成年无码久久久久毛片| 韩国国内大量揄拍精品视频| 伊人伊成久久人综合网| 天天躁夜夜躁狠狠躁2021a2| 精品人妻一区二区三区浪潮在线| 亚洲一区在线观看尤物| 国产精品免费看久久久| 国产精品综合色区小说| 夜夜爱夜鲁夜鲁很鲁| 成人国产一区二区精品| 99久久国产自偷自偷免费一区| 免费看又色又爽又黄的国产软件| 国产福利一区二区三区高清| 欧洲美洲精品一区二区三区| 妺妺窝人体色www看美女| av无码动漫一区二区三区精品| 综合亚洲综合图区网友自拍| 国内少妇高潮嗷嗷叫在线播放| 久久国产美女精品久久| 日本欧美大码aⅴ在线播放| 国产97在线 | 中文| 亚洲国产成人最新精品| 国产精品无码综合区| 影音先锋在线亚洲网站| 国产亚洲精品久久久久久老妇| 人人妻人人澡人人爽人人dvd| 国产高清不卡一区二区| 国产一区二区三区精品av| 国产乱人伦偷精品视频不卡| 九九99久久精品在免费线18|