欧美在一区I久久综合九色I久久avavI毛片随便看I久久婷婷开心I91在线看免费I久久久影片I国产精品久久久一区二区I97色国产I毛片永久新网址首页I精品专区一区二区

Current Location:Home > Product > Steel wire annealing > Aluminum bar forging furnace

2020-07-20 17:48:44

Share
  • Share to WeChat Moments

Round steel forging diathermy equipment

  • Description

圖片012.png

Operation steps of round steel forging diathermy equipment and bar diathermy forging equipment

1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


Maintenance of round steel forging diathermy equipment and bar diathermy forging equipment

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

高頻10.jpg


Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 少妇被躁爽到高潮无码久久| 久久久久性色av毛片特级| 欧美群交射精内射颜射潮喷| 亚洲成本人无码薄码区| 色噜噜狠狠狠狠色综合久| 少妇人妻偷人精品视频1出轨| 国产亚洲精品久久久久久久久| 四虎影视国产精品永久在线| 国产色婷婷精品综合在线| 国产成人av在线免播放app| 国产精品进线69影院| 久久国产中文娱乐网| 天天澡日日澡狠狠欧美老妇| 婷婷五月开心亚洲综合在线| 无码欧美黑人xxx一区二区三区| 国产乱码人妻一区二区三区| 大桥久未无码吹潮在线观看| 久久精品国产99精品国产亚洲性色| 亚洲熟女乱色一区二区三区| 成人无码看片在线观看免费| 成人国内精品视频在线观看| 亚洲一区在线观看尤物| 欧洲国产精品无码专区影院| 亚洲第一av网站| 国内精品久久人妻朋友| 中文人妻无码一区二区三区在线| 精品亚洲国产成人av在线时间短的| 免费人成视频在线播放| 国产精品毛片| 亚洲成aⅴ人片久青草影院| 99国产欧美另类久久片| 国产人与zoxxxx另类| 永久黄网站色视频免费直播| 性猛交ⅹxxx富婆视频| 男女18禁啪啪无遮挡| 人人玩人人添人人澡免费| 男人的天堂国产在线视频| 2021无码最新国产在线观看| 中文字幕v亚洲日本在线| 国产成人无码av大片大片在线观看| 欧美性生 活18~19|