Operation steps of infrared temperature measurement forging heating furnace

1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


Maintenance of Forging Furnace with Infrared Temperature Measurement

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

高頻10.jpg



Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 2019久久久高清日本道| 在线播放亚洲人成电影| 无码专区亚洲制服丝袜| 亚洲国产欧洲综合997久久| 色狠狠av一区二区三区| 又大又粗弄得我出好多水| 成人国内精品视频在线观看| 国产又黄又硬又粗| 色狠狠成人综合网| 亚洲十八禁| 亚洲永久精品ww47永久入口| 成人伊人亚洲人综合网| 2021精品国产自在现线| 亚洲精品无码你懂的| 无码永久成人免费视频| 精品亚洲国产成人av| 国产成人午夜福利在线视频| 国产suv精品一区二人妻| 2021无码最新国产在线观看| 国产麻豆精品av在线观看| 久久综合狠狠综合久久激情| 婷婷中文字幕| 中文字幕无码家庭乱欲| 精品久久久久久| 激情综合丁香五月| 浓毛欧美老妇乱子伦视频| 狠狠色综合久久丁香婷婷| 成人无码av一区二区| 麻花传媒mv国产免费观看视频| 亚洲精品中文字幕无码av| 无码无需播放器av网站| 久久天天躁狠狠躁夜夜躁2014| 欧美人妻体内射射| 人妻人人做人做人人爱| 又硬又粗又大一区二区三区视频| 亚洲中文字幕久久精品无码2021| 久久久精品波多野结衣| 亚洲女女女同性video| 国产在线观看www污污污| 99热热久久这里只有精品68| 五月丁香六月激情综合在线视频|